London Dock Block C1
BDL carried out the drylining and ceiling package at London Dock, consisting of 178 apartments in a 26-storey tower as part of the larger London Dock Scheme. The works include drylining, partitioning, M/F Ceilings, screeding and finishing works.
DEVELOPER:
St George City Limited
ARCHITECT:
The Manser Practice
PROJECT VALUE:
£3.5m
DURATION:
78 weeks - Completion Jan 2022
SPECIFICATION:
British Gypsum