Drylining, partitions and shaft wall including acoustic stopping and the installation of Profab Riser doors.

DEVELOPER:
British Land

ARCHITECT:
Wilkinson Eyre Architects

SCOPE:
Drylining to shell and core areas and perimeter linings, Steel Frame Systems (SFS) and associated works to the façade

PROJECT VALUE:
£4.77m

DURATION:
17 Months - May 2021 to December 2022

SPECIFICATION:
British Gypsum K10. BS8212

ENVIRONMENTAL INITIATIVE:
Material bins have been created to increase the amount of off-cut boards being re-used. The number of boards saved per week are tracked, reducing the amount of waste and total board numbers used in the installation.