ARCHITECT:
Arup

PROJECT DURATION:

67 Weeks

PROJECT COMPLETION:
March 2021

SCOPE:
8 Storey Building Refurb. Fit Out 220nr WC ‘s & Cyclist Shower Area inc BDL prefab IPS walls, Fit Out to Core 1 & 2 Lift Lobby’s, 325nr Timber Door Sets, Management Area Fit Out.

SPECIFICATION:
WC’s Cubicles Stained Black Oak Veneer, Corian Seamless vanity tops, Lift Lobby stained ash veneer wall linings, with bronze contrast trims and herringbone porcelain tiles. Barrisol stretched fabric covered light boxes. British Land’s first BREEAM Outstanding building.